Setup Table of Contents Schematic View Figure: Extraction (top) and injection (bottom). The figure above depicts the setup. Group DDS system generate H=1 cloc...
January 2021: Dry Run Table of Contents Introduction In January 2021 the B2B system was tested during a dry run. The following new features have been deployed a...
2021 Feb 21: 'Old' Timing Generator Table of Contents Introduction The b2b system was operated 'dry' in parallel to standard machine operation for bunch to coast...
Tests and Masurements Table of Contents Bunch 2 Bucket Lite * More Stability Tests (01/2024) * Testing Stability at SIS18 Extraction (12/2023) * Testing...
Bunch to Bucket Transfer System This work package was frozen from mid 2017 to mid 2019 The purpose of the Bunch to Bucket (B2B) transfer system is to transfer i...