List of To-Do Items

To Do List

This is an informal To Do list by the b2b Team. The list is no project planning, but might be useful for project planning.

To-Do Items

nr what release short term contact depends year
1 clean up wiki     DB   2020
39 labeling of cables in BG 1.016     DB   2021
58 labeling of cables in TH (rf-container)     DB   2021
63 labeling of ACC cables in YR cave     DB   2021
66 address individual bunches/buckets     DB   2021
69 raw server: rethink text alignment     DB   2021
70 'clear diag' should clear all status bits     DB   2022
71 labeling of cables in SIS kicker room     DB   2022
72 labeling of cables in ESR kicker room     DB   2022
75 updates b2b-mon (old data after start)     DB   2022
77 CBU does not realize missing WR link     DB   2022
78 library debug log, print SID @ injection     DB   2022
80 ParamModi: mark ignored input fields Z   DB, CCT, HL   2022
83 kickers: comparator setting via remote control     DB, KK   2022
Table: To Do List. Year of entry to table is given in the last column. X: b2b team, Y: FESA team, Z: Model/LSA/APP team

Completed Items

nr what release short term contact depends year
2 comparator box ESR extraction   x DB   2020 (2020)
3 rf phase prediction check at PM   x DB   2020 (2020)
4 gathering of monitoring data at PM     DB 6 2020 (2020)
5 concept CRYRING kicker control     DB   2020 (2021)
7 implement CRYRING kicker control     DB   2020 (2022)
8 control system integration     DB 13 2020 (2022)
9 CBU FESA class     DB   2020 (2021)
10 LSA and Model integration     DB   2020 (2021)
11 CBU command line interface   x DB   2020 (2020)
12 monitoring command line interface   x DB   2020 (2020)
13 diagnostic data to graylog     DB   2020 (2022)
14 control / monitoring PC in R29.5     DB   2020 (2020)
15 additional patch panel in in R29.5     DB   2020 (2020)
16 additional TR in R29.5     DB   2020 (2020)
17 on-line DAQ: rising edges only     DB   2020 (2020)
18 BuTiS and WR clocks in R29.5     DB   2020 (2020)
19 better installation in SIS kicker room     DB   2020 (2021)
20 installation at PHELIX     DB   2020 (2021)
21 B2B @ CBU (mode 4)     DB   2020 (2020)
22 timeout wait4eca ms->us     DB   2020 (2021)
23 monitoring of 'matching'     DB   2020 (2020)
24 socat for dev/wbm1   x DB   2020 (2020)
25 protection against 'late events'     DB   2021 (2021)
26 'kicker snooping'     DB   2021 (2021)
27 unambigous indexing (BPID?)     DB   2021 (2021)
28 testing for broader nue and H range     DB   2021 (2021)
29 more modular acquisition and monitoring     DB   2021 (2021)
30 sufficiently 'add of beat periods'     DB   2021 (2021)
31 check ESR CBU for bad trigger (EKS)     DB   2021 (2021)
32 statistics for kicker diagnostics     DB   2021 (2021)
33 OpReady (nolink, nolock)     DB   2021 (2021)
35 Group DDS for testing (SIS18, ESR)     DB   2021 (2022)
34 use ID Mask when building messages     DB   2021 (2021)
36 fix phase measurements at higher nue     DB   2021 (2021)
37 monitoring: add time+date     DB   2021 (2021)
38 oscilloscope: set time+date     DB   2021 (2021)
40 rarely: PM fails @ 2687756.996606 Hz     DB see 41 2021 (2021)
41 error counter/handling in monitoring     DB   2021 (2021)
42 beating: sometimes 1 period too early/late     DB   2021 (2021)
maybe related to late message prevention          
43 remove unused code from b2b-ctl     DB   2021 (2021)
44 get scope repaired and reinstalled     DB   2021 (2021)
45 installation new comparators     DB   2021 (2021)
SIS18 kicker room     DB   2021 (2021)
ESR kicker room     DB   2021 (2021)
SIS18 and ESR RRF supply rooms     DB   2021 (2021)
YR RRF supply room     DB   2021 (2021)
46 implement CMD_B2B_START as trigger     DB   2021 (2021)
47 power outlets in YR kicker racks     DB, JF   2021 (2021)
48 ACC outlets in YR kicker racks     DB, ?   2021 (2021)
49 WR outlets in YR kicker racks     DB, ?   2021 (2021)
50 signal sources and sinks in YR kicker racks     DB, JF, UR   2021 (2022)
51 installation CBU + PM YR RRF room     DB, DL   2021 (2021)
52 installation KD YR cave (injection)     DB, JF   2021 (2022)
53 installation KD YR cave (extraction)     DB, DL   2021 (2022)
54 re-installation KD SIS18 (extraction)     DB, DL   2021 (2021)
55 clean up event numbers     DB   2021 (2021)
56 nomen for FESA classes     DB   2021 (2021)
57 b2b-viewer: KTE-fin buggy, fix     DB   2021 (2022)
59 real DDS frequency measurement     DB, MR   2021 (2022)
60 YR kicker, connection to probes (-> KK/EE)     DB, JF   2021 (2023)
61 signal and comparator setting DDS (requires sine signal)     DB, DL   2021 (2022)
62 signal and comparator setting probes (SIS, ESR)     DB, KK, JF   2021 (2023)
64 PM: frequency measurement down to 40 kHz     DB, MR 67 2021 (2021)
65 h=1 operatation SIS->ESR->YR     DB   2021 (2021)
67 PM: phase measurement down to 40 kHz     DB, MR   2021 (2021)
68 system monitor: fix 'no_link text issue     DB   2021 (2021)
73 trigger event: no LSA/ID data in param field     DB, CCT   2022 (2023)
74 trigger event: correct SID for injection ring     DB, DDay   2022 (2023)
76 old data b2b-mon: mark entries > 24h     DB   2022 (2023)
79 ParamModi: transfer data: ext -> inj ring     DB, CCT nee, bleibt so wie es ist 2022 (2022)
82 Data Supply: always schedule CMD_B2B_START (even in Mode OFF)     DB, CCT   2022 (2023)
84 DDS frequency measurement at injection ring     DB 82 2022 (2023)
85 detect falling edge of probe signal     DB 83 2022 (2023)
87 sub-ns phase measurement     DB   2022 (2023)
88 suppress injection kick in case of preceding error (stacking!)     DB   2022 (2023)
89 FESA Klasse / shared lib: Ruecklese fuer Multi-Beat-Tune pruefen     DB   2022 (2023)
92 phase/frequency monitoring even in mode 'OFF'     DB 82 2022 (2023)
Table: List of completed To Do items. Year of entry to table is given in the last column. Year of completion is shown in brackets.

Dropped Items

81 Data Supply: BPID for FESA? (SID for firmware!)     DB, CCT   2022 (2022)
86 interface to Q-Kicker timing (kein Ergebnis, geht irgendwie anders)     DB, RHV, SIS18 (CCT) Dietrich: Vorgespraech mit JS, PK, RHV; *, 82 2022 (2023)
90 Koppel-ID instead of SID_Ext? Hm...     DB   2022 (2022)
91 Idea Markus Steck: 4 buckets as distinct extractions to HITRAP (this is a modelling/LSA task)   LSA/Model   2022 (2022)
93 B2B Mode Naming     DB   2022 (2023)
Table: List of dropped items. Year of entry to table is given in the last column. Year of completion is shown in brackets.

-- DietrichBeck - 28 June 2023
Topic revision: r39 - 19 Aug 2024, DietrichBeck
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding Foswiki? Send feedback