2021 Feb 21: 'Old' Timing Generator Table of Contents Introduction The b2b system was operated 'dry' in parallel to standard machine operation for bunch to coast...
Tests and Masurements Table of Contents Bunch 2 Bucket Lite * More Stability Tests (01/2024) * Testing Stability at SIS18 Extraction (12/2023) * Testing...
Bunch to Bucket Transfer System This work package was frozen from mid 2017 to mid 2019 The purpose of the Bunch to Bucket (B2B) transfer system is to transfer i...