Dry Run Planning for AP / LSA

Dry Runs in 2019

Link to Shutdown / Beamtime Planning (may be outdated)
  • 24.-26.09.2019 SIS, ESR, CryRing
  • 22.-24.10.2019 SIS, ESR
  • 04.-05.11.2019 SIS, ESR + 06.-08.11.2019 ESR
  • 15.-17.11.2019 CryRing

Dry Run 3 (24.-26.09.2019)

Status Product Short Description Developer Tester Long Description, Lists, Links
proposed LSA Dot Timing Creation Andreas LSA-TEAM The Dot-Timing-Creation mechanism in LSA was completley refactored / rewritten to fit the requirements for storage ring mode implementations. Therefore each feature of the dot generation should be retested. This includes pattern repetitions, Unilac injections, SIS-ESR-Coupling and the new storage ring features (at the moment only break points).
proposed LSA, ParamModi, SchedulingApp, ... Storage Ring Mode LSA-TEAM APP-TEAM The newly implemented Storage Ring Mode features should be tested. This includes pattern with subchains.
proposed LSA CryRing coupling LSA-TEAM LSA-TEAM It should be possible to couple a CryRing pattern with an ESR pattern so that the CryRing will be able to get beam from ESR.
proposed LSA, FESA, Sequencer Ramp up / ramp down LSA-TEAM, Peter Kainberger LSA-TEAM Bringing ESR to injection level via a Sequence that utilizes Command Mode for ramped FESA devices. Check that ramping up, then playing Patterns, then ramping down works both on the level of LSA and of devices / function generators.
proposed DeviceControl PowerOn/Off Sigi Heymell Sigi Heymell Additional Status (DeviceAccess: STATUS, not INFOSTAT as usual) is read after Power-On/-Off. Check rendering, especially if a device was already in this power state.
proposed DeviceControl Driving actuators: time monitoring when driving Sigi Heymell Sigi Heymell Total driving progress should be considered for all actuators (except for PPOS devices) and gate valve

Dry Run 4 (22.-24.10.2019)

Status Produkt Short Description Developer Tester Long Description, Lists, Links
proposed Product X Function Y developer tester long desc.

Dry Run 5 (04.-08.11.2019)

Status Produkt Short Description Developer Tester Long Description, Lists, Links
proposed Product X Function Y developer tester long desc.

Dry Run 6 (15.-17.11.2019)

Status Produkt Short Description Developer Tester Long Description, Lists, Links
proposed Product X Function Y developer tester long desc.